電阻層析成像模塊應(yīng)用案例-基于生成對抗網(wǎng)絡(luò)的地鐵盾構(gòu)超前探測方法研究
電阻層析成像模塊
基于生成對抗網(wǎng)絡(luò)的地鐵盾構(gòu)超前探測方法研究
Research on Advanced Detection Method of Metro Shield Machine Based on Generative Adversarial Networks
背景介紹
Background
盾構(gòu)機(jī)(簡稱TBM)以其施工安全的gao xiao特點(diǎn)被廣泛應(yīng)用于地鐵隧道建設(shè)中,TBM施工過程中經(jīng)常會出現(xiàn)預(yù)料不到的塌方、突涌水等地質(zhì)災(zāi)害,這嚴(yán)重影響工程的進(jìn)展,增加工程的造價。本文案采用聚焦直流電法超前探測技術(shù),以TBM前方不良地質(zhì)體的反演成像作為目標(biāo),引入生成對抗網(wǎng)絡(luò)算法 。
Shield boring machine (TBM) is widely used in subway tunnel construction with its safe and efficient construction characteristics, and unexpected geological disasters such as landslides and water inrushes often occur during TBM construction, which seriously affects the progress of the project and increases the cost of the project. In this paper, the advanced detection technology of focused direct current method is adopted, and the generative adversarial network algorithm is introduced by taking the inversion imaging of bad geological bodies in front of TBM as the goal
關(guān)鍵技術(shù)1:聚焦直流電法盾構(gòu)超前探測技術(shù)
The focused direct current (DC) electrical method for advance detection in shield tunneling
關(guān)鍵技術(shù)2:二維有限元正演模擬
Two-dimensional finite element forward simulatio
關(guān)鍵技術(shù)3:基于相似性原理的物理模型實(shí)驗(yàn)
Physical model experiments based on the principle of similarity
相關(guān)產(chǎn)品
免責(zé)聲明
- 凡本網(wǎng)注明“來源:化工儀器網(wǎng)”的所有作品,均為浙江興旺寶明通網(wǎng)絡(luò)有限公司-化工儀器網(wǎng)合法擁有版權(quán)或有權(quán)使用的作品,未經(jīng)本網(wǎng)授權(quán)不得轉(zhuǎn)載、摘編或利用其它方式使用上述作品。已經(jīng)本網(wǎng)授權(quán)使用作品的,應(yīng)在授權(quán)范圍內(nèi)使用,并注明“來源:化工儀器網(wǎng)”。違反上述聲明者,本網(wǎng)將追究其相關(guān)法律責(zé)任。
- 本網(wǎng)轉(zhuǎn)載并注明自其他來源(非化工儀器網(wǎng))的作品,目的在于傳遞更多信息,并不代表本網(wǎng)贊同其觀點(diǎn)和對其真實(shí)性負(fù)責(zé),不承擔(dān)此類作品侵權(quán)行為的直接責(zé)任及連帶責(zé)任。其他媒體、網(wǎng)站或個人從本網(wǎng)轉(zhuǎn)載時,必須保留本網(wǎng)注明的作品第一來源,并自負(fù)版權(quán)等法律責(zé)任。
- 如涉及作品內(nèi)容、版權(quán)等問題,請在作品發(fā)表之日起一周內(nèi)與本網(wǎng)聯(lián)系,否則視為放棄相關(guān)權(quán)利。